Seat belt detection equipment use precautions.

Safety belt detection equipment use precautions
Article from Qingdao Zhongbang Instrument Co., Ltd. Technology Department
The seat belt testing equipment is the important test equipment for the safety belt manufacturer's quality control, LA safety mark certification and industrial production license evaluation, as well as the construction engineering inspection unit and the labor insurance station inspection qualification review. The main equipment of Zui has ZD-715 seat belt. Overall dynamic load static load tester, ZD-717 seat belt overall slip tester, ZW-737 salt spray test chamber and ZD-718 seat belt tensile tester. Seat belt testing equipment is different from general testing equipment. Because the belt testing equipment mostly simulates the actual use environment and state test, the required test site is relatively large, and the professional level of the experimenter is required to be relatively high, and the safety awareness is relatively strong. The safe operation rules must be strictly observed in the use of the project. The following are the precautions for the use of these devices:
1. ZD-715 seat belt overall dynamic load, static load testing machine
1. Non-professional maintenance personnel shall not open the cover and disassemble and change the internal electrical components of the instrument.
2. In case of emergency, please press the emergency stop button quickly and cut off the main power supply. After the fault is removed, turn it on again.
3. The power supply of the instrument is a single-phase AC power supply, and there must be a reliable grounding wire.
4. When the instrument is not used for a long time or encounters rain or snow, you need to remove the dynamic sensor. The removal step is: the person must climb to the corresponding height while wearing the seat belt, remove the plastic parts, remove the sensor with a wrench, and remove the corresponding connecting wires.
5. When the instrument is not used for a long time or encounters rain or snow weather, it is necessary to properly protect the instrument components. For example, the box with the motor is covered with a tarpaulin to prevent rainwater from entering the inside of the box along the top hole, causing damage to the motor. The controller of the electric lifting device needs to be wrapped with a tarpaulin to prevent rainwater from entering and the like.
6. The function of the flat sling in the accessory is the secondary protection of the seat belt. When the test belt is unqualified, the flat sling can only be subjected to three impacts. When testing again, the flat sling must be replaced.
7. During all test procedures, as long as the simulated person leaves the bottom surface, the tester must stay away from the shelf for more than 3 m, whether during lifting or release. Prevent accidental injuries caused by falling objects. One minute after the completion of the test, the person can enter the internal position of the frame to handle the follow-up.
9. In the static load test, because the test force value is relatively large, in order to prevent the tester from causing injury when the sample breaks, the safety net is hung on the side of the shelf where the tester operates.
10. Be sure to equip the UPS uninterruptible power supply that matches the instrument (otherwise, in the unstable power supply state, the simulated person has the danger of falling!), in the event of an emergency power outage, quickly turn the selector switch to “keep the pull-in” Status, then turn off the instrument. When the power supply is normal, lower the simulator, then turn the selector switch to the "test state" and restart the test.
Second, ZD-717 seat belt overall slip tester
1. The instrument must be fixed with anchor bolts.
2. The column must be fixed during the test.
3. Adjust the flap during the test so that the column is located in the groove of the flap.
Third, seat belt tension machine
1. The instrument has two display windows on the instrument. The * window displays the sensor force value in N; the second window displays the countdown time in seconds.
2. Before starting the test, please warm up for 15 minutes.
3. Please keep your head and hands close to the chuck and moving parts when the instrument is running to avoid injury.
4. Non-professional maintenance personnel shall not open the cover and disassemble and change the internal electrical components of the instrument.
5. In case of emergency, please press the emergency stop button quickly and cut off the main power supply. After the fault is removed, turn it on again.
6. The power supply of the instrument is a single-phase AC power supply, and there must be a reliable grounding wire.
7. The dynamic test part of the instrument is equipped with upper (lower) limit stroke protection. When the loading device runs to the upper (lower) limit position, it plays a protective role. At this time, you need to press "reset" ("start") or pass "Dropping" ("Dropping") drops (rises) the loading device a distance.
8. The “Reset” button on the operation panel can only be used after the end of one test, that is, the indicator light flashes and the beep is 10s, and the “clear” button should be used to stop the test.
This article is the original article of Qingdao Zhongbang Instrument Co., Ltd. If you need to reprint, you must add the source of the description, and you will be responsible for reprinting without permission.

Supplier Extract Powder

We're Professional Supplier Extract Powder manufacturers and suppliers in China specialized in providing high-quality products at low price. We warmly welcome you to buy or wholesale bulk Supplier Extract Powder for sale here from our factory. For a free sample, contact us now.


Supplier Extract Powder,Supplier Extract ,Supplier Powder Manufacturer in China

Shaanxi Kang New Pharmaceutical co., Ltd. , https://www.bodybuildingoil.com