Emergency prevention and treatment of large-scale application equipment

Specific operation steps start-check-operation-troubleshoot--use note

Boot operation

1. Manual boot operation

Before starting, adjust the spray machine (spray machine operation quality) horizontal angle, vertical angle, vertical swing amplitude, check whether the door of the electrical control box is closed, and turn the power switch to the "on" position. First, turn the selector switch on the electrical control box to the short-range position. At the same time, turn the throttle handle of the diesel engine to the running position, press the pressure reducing valve, and then start the engine with the key. After the generator starts, wait 2 minutes, then follow The control cabinet panel indicates that the fan, the medicine pump, and the swing start (green) button are pressed once (note that the fan needs to be delayed for 20 seconds before pressing the pump, the swing button), and the entire sprayer will operate normally. Press the rocking stop (red) button, the medicine pump will stop spraying; press the fan stop (red) button, the fan, the medicine pump, and the swing will all stop. To stop just press the throttle stop handle and then turn off the generator start key.

prompt

a. Press the fan start button, please press the button for about 2 seconds.

b. When the fan starts, the ammeter refers to 40A instantaneously. It is a normal phenomenon, but it must return to 11-13A very quickly. If it cannot return to 11-13A for a long time, stop it immediately and check the load and circuit.

2, remote boot operation

Turn the power switch to the "on" position, turn the selector switch on the electrical control box to the remote position, and at the same time, turn the throttle handle of the diesel engine to the running position, press the pressure reducing valve, start the generator with the key, and then In the cab, press the button on the remote control panel to start the fan, medicine pump, swing start and stop (A(1), B(3), C(5) represent the fan, medicine pump, swing start, D(2), E(4), F(6) respectively. Fan, medicine pump, swing stop), complete the spray operation of the remote sprayer.

prompt:

When you manually operate the fan, the medicine pump, and the swing start, the sprayer is in the working state. When you want to switch to the remote control, simply turn the selector switch of the electrical control box to the remote position and perform the remote control operation.

Precautions

1. Do not loosen or re-adjust the speed limit bolt and fuel controller bolt during the operation of the generator, otherwise it will directly affect the mechanical performance.

2. If the external equipment of the continuous generator is running abnormally, working slowly or suddenly stopping, the switch of the generator set should be turned off immediately, the connection between the equipment and the unit should be cancelled, and the problem should be checked.

3. If a current overload occurs, use the circuit to trip, reduce the load on the circuit, and wait a few minutes to restart.

4. The DC output terminal is only used to charge the battery. (cannot be used for other types of loads)

5. Before charging the battery, it is forbidden to cut off the wire on the negative pole of the battery. The positive pole of the battery must be connected to the positive pole of the DC output of the unit. Do not connect the wrong unit or it will damage the unit and the battery.

6. The total power of DC and AC output should not be greater than the rated power of the unit. The output current should not exceed the rated output current of the generator.

7. Pay attention to wearing protective clothing, gloves and mask when adding medicine.

8. Do not touch the muffler and the body while the diesel engine is not cooling during operation or shutdown, so as to avoid being burnt by the high temperature.

9. The generator should have good grounding and it is forbidden to touch the generator set with wet hands to avoid electric shock and short circuit.

10. Avoid sprayer rain or work in rainy days.

11. It is strictly forbidden to spray high and low voltage agricultural power, grid lines and facilities.

12. After the spray is completed, rinse the spray box with clean water and spray with water for 2 minutes to complete the cleaning of the sprayed parts.

Freeze-dried Half Of Fruit

Freeze-drying powder process includes: fresh fruit selection - cleaning - cutting - blanching - cooling - drying - grinding beating - gel grinding - sterilization - pre-freezing - vacuum freeze-drying - ultra-fine grinding - weighing packaging - testing - finished product.



Firstly, fresh and mature fruits with good quality were selected in the pre-treatment area of the food lyophilizer, and the leaves were removed to remove impurities. Then, preliminary cleaning and simultaneous sterilization of fruit surface were carried out. After sterilization, the fruits were cleaned and drained again. After the drain, the fruit is sliced and treated by blanching process. After the color preservation, the fruit is treated by pulping, and then pasteurized. The pretreatment process is finished before lyophilization.



The processing core of freeze-drying powder is the equipment area of food freeze-drying machine. After pre-treatment, the fruit enters the equipment of food freeze-drying machine and crystallizes into a solid state at low temperature, and then sublimates and dries in a vacuum environment to obtain freeze-drying products with little water content. Freeze-dried products out of the warehouse into the food freeze-dried post-processing area, ultrafine grinding, and then according to the need to do weighing packaging, after testing the finished products packed into storage.

Raspberries

Freeze-Dried Half Of Fruit,Mulberry Fruit Powder,Freeze Orange Powder,Raspberry Freeze Dried Powder

Shaanxi HuiKe Botanical Development Co.,Ltd , https://www.oasis-hk.com